--- Our House Gallery: Construction #2 ---

This page contains pictures of the progress of building our house, from the start of framing to the roof-on stage. The pictures are in reverse chronological order.


22 Apr 98: The roof! Everything is just sitting there at present, not concreted down, but it's a roof:

21 Apr 98: Roofing sub-contractors using a conveyor-belt to move the roof tiles from the pallets to piles on the roof:

18 Apr 98: The newly-added soffit and fascia (and a bracket for the guttering):

6 Apr 98: Looking from the patio towards the dining room, showing the pallets of roof tiles and the black paper insulation:

6 Apr 98: A close-up of the roof tiles, showing the approximate colour; it is green with blue tints, and is called "Greenstone":

31 Mar 98: Another view of the dining room, standing in the kitchen; this time showing the roof framing:

31 Mar 98: A view from outside (from the patio), showing the wall and roof framing of the dining room:

24 Mar 98: Here's a view of the wall framing looking towards the patio area, from the back-right corner of the site:

24 Mar 98: A view of the framing in the dining room, standing in the kitchen:

24 Mar 98: The framing from the usual position by the lounge:


Click here to go back to the news page.